In the next days I'll write a guide on how to create a Demo with the new features of WLS 12.2.1, these the steps:
[I'll start on 30 December 2015, prerequisite THIS previous post]
30 December 2015
- Download and installation of Oracle VM VirtualBox
- Download and installation of Oracle VM VirtualBox guest additions
- Download of Oracle Enterprise Linux 7 (OEL7)
- Creation of a VirtualBox VM based on OEL7 and some configurations
31 December 2015
- Installation of JDK 8 on OEL7
- Installation of WLS 12.2.1 on OEL7
- Installation of OTD 12.2.1 on OEL7 with required libraries
01 January 2016
- Creation of an OTD 12.2.1 Domain and configuration of an OTD Instance
02 January 2016
- Creation of a WLS 12.2.1 domain
- How to "link" WLS & OTD
- Creation of a Dynamic Cluster
- Creation of Domain Partitions
03 January 2016
- How to build samples provided with WLS 12.2.1
03 January 2016
- Deploy of demo applications in Domain Partitions
- Deploy of the same Application on two Domain Partitions
- Demonstration of the Isolation of the Domain Partitions
04 January 2016
- Creation and test of a CPU Resource Consumption Manager
- Creation of simple jsp able to increase CPU for testing scope
- How to use Jmeter to Test a RCM
- How to use JMC to monitor JVM resources
05 January 2016
- Creation and test of a HEAP Resource Consumption Manager
- Creation of simple jsp able to increase HEAP for testing scope
12 January 2016
- Creation and test of a Diagnostic Module with Scale UP Action
- Utilization of JMeter to create traffic/throughput for the Scale UP action
- Utilization of DASHBOARD to monitor the test of the diagnostic module
Nessun commento:
Posta un commento